Vent Termination Requirements - Weil-McLain WM97+70 Manual

Gas-fired water boiler
Hide thumbs Also See for WM97+70:
Table of Contents

Advertisement

WM97+
-
gas
fired water boiler

Vent termination requirements

The vent termination must be located to meet all requirements below (also applies to vertical vent
Figure 19
terminations). For Canadian installations, defer to the requirements of CSA B149.1 or B149.2 Installation Code.
Part number 550-142-085/0712
— Boiler Manual
– 23 –

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wm97+110Wm97+155

Table of Contents