Dell E176FPc Service Manual page 26

17” lcd monitor
Table of Contents

Advertisement

Dell E176FPc
EVA washers
Install:
Fix the LVDS connector by black
tape and EVA washers.
Note: Make LVDS connector's
LVDS Cable
metal side adown for HYDIS
Black tape
AND LG panel and upturned for
AU panel.
Remove the nine screws by
Torque B
and remove the power
board and main board.
Note: Magnetism ring should be
laid underneath the power board
Magnetism ring
Install:
Fix the LVDS cable by black tape
as the figure.
26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents