Buderus Logano GA244 Installation, Operation And Maintenance Manual page 48

Sealed combustion hot water gas boiler
Hide thumbs Also See for Logano GA244:
Table of Contents

Advertisement

12
Maintenance
START
Stage 1
Trial for ignition
Stage 2
Main burner
operation
END
We reserve the right to make any changes due to technical modifications!
Installation, Operation and Maintenance Manual Sealed Combustion Gas Boiler Logano GA244 • Issue 02/2004
48
Thermostat (Controller) calls for heat
Fan motor starts operating.
Spark generator powered
• Pilot valve opens.
Pilot burner operation
Pilot burner light,S 8600 H senses
flame current.
If flame current sensed
• Spark generator off
• Main valve operator opens
Main burner operation
• S 8600 H monitors pilot flame current
Thermostat (controller) satisfied
Main and pilot valve close, burners shut off.
Fan motor is shut off.
Pilot burner does not light.
or
S 8600 H trial for ignition continues for
90 seconds and locks out.
Power interuptions
System shuts off. Restarts
when power restored?
Pilot flame failure
Main valve closes,
S 8600 H starts trial for
ignition.
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents