Robin RGD500 Service Manual page 36

Hide thumbs Also See for RGD500:
Table of Contents

Advertisement

P a n
to remove
Control Box
Pipe Frame
t
Description
Remarks
(4)
Remove the control box from the frame.
64Washer..
.......
3pcs.
6 4 b o l t . .
.........
3pcs.
Fig. 10-9
(1)
Remove side plate A.
69
bolt
. . . . . . . . . . .
2 pcs.
Remove the mount rubbers from side
plate.
(2) Remove the nuts and bolts
that
fasten
the generatar and frame together.
1.
Remove
the two
bolts which f u r the
alternator
to the
generator base.
2. Remove the four bolts and flange
nuts which
f u c
the engine to the
engine base.
8@
bolt
...........
4
pcs.
84 flange nut
. . . . . . .
4 p a .
Nuts are welded to
the generator base.
Nexesarytwl
10 mm spanner or
box spanner
12
mm spanner or
box spanner
80
FLANGE NUT.. 4
pa.
RUBBER
V.I.
. . .
ENGINE BASE
SIDE
PLATE A
. . . . .
- 2
p a .
2
pa.
4
DQ.
80
BOLT
. . . . .
- 4
pes.
Fig. 70-70
-
33-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents