Operation - Volvo C70 Quick Manual

Hide thumbs Also See for C70:
Table of Contents

Advertisement

OPERATION, ROOF
PREPARATIONS
No objects on parcel shelf, roof or boot lid.
2 m clearance and 0.2 m behind.
Level ground.
Outside temperature above -10 ˚C.
Closed cargo separator and boot lid.
Pay attention that no individual is close
to the roof's moving parts during its

operation.

The side windows lower several centimetres
when the roof is operated. They then return
automatically.
CARGO SEPARATOR
The cargo separator limits the cargo area to
make space for the folding roof.
1.
Raise the cargo separator during loading.
2.
Fold down the cargo separator fully until
locked (3) before lowering the roof (see
the label on the cargo separator).
OPERATION
1.
The car must be stationary.
2.
The engine must be running at idling
speed.
3.
Depress the brake pedal.
4.
Press and hold button (A) or (B) until a
signal sounds and the message
CLOSED/ROOF OPEN
display.
5.
Release the button.
LOADING ASSISTANCE
Raise/lower the lowered roof to facilitate
loading.
1.
Hold in the button until the roof is raised.
2.
Raise the cargo separator, load, and then
fold it down fully.
3.
Hold in the button until the roof is
lowered.
ROOF
is shown in the

Advertisement

Table of Contents
loading

Table of Contents