Installing the Chassis into a Rack (Figure 2-5)
1.
Confi rm that chassis includes the inner rails and rail extensions . Also, confi rm
that the outer rails are installed on the rack.
2.
Line chassis rails with the front of the rack rails.
3.
Slide the chassis rails into the rack rails, keeping the pressure even on both
sides (you may have to depress the locking tabs when inserting). When the
server has been pushed completely into the rack, you should hear the locking
tabs "click".
4.
(Optional) Insert and tightening the thumbscrews that hold the front of the
server to the rack.
Figure 2-5. Installing the Server into a Rack