Air Purging - Heat Controller VMH 30 Series Installation, Operation & Maintenance Manual

Inverter single zone ductless mini split heat pump
Hide thumbs Also See for VMH 30 Series:
Table of Contents

Advertisement

Heat Controller, Inc.
5

1. Air purging

Air and moisture in the refrigerant system have undesirable effects. Therefore, the indoor unit
and tubing between the indoor and outdoor unit must be leak tested and evacuated to remove
any noncondensables and moisture from the system.
Check that each tube(both liquid and gas side tubes) between the indoor and outdoor units have
been properly connected and all wiring for the test run has been completed.
Pipe length and refrigerant amount:
Units are pre-charged for 16.5 ft. (5m) total line set length, additional charge is needed for longer
line sets lengths. Charge adjustments are not required for line sets less than 16.5 ft (5m)
Capacity
Btu/h
30-36k
*Unit charge located on rating plate includes enough refrigerant for 16.5 feet of line set.
* Charge adjustment is not required on line set lengths less than 16.5 feet.
Ensure any R-410A refrigerant is added to the unit in liquid form.
CAUTION
Open the valve stem until it hits against
the stop. Do not try to open it further.
Securely tighten the valve stem cap with
a spanner or wrench.
See tightening torque table on page 8 to
properly tighten and torque the valve stem cap.
2. When using the Vacuum Pump
NOTE: Refer to the manifold valve manufacturer's instructions before use.
1. Completely tighten the flare nuts, A, B, C, D, (see figure
on page 10) connect the manifold valve charge hose to a
charge port of the low pressure valve on the gas side.
2. Connect the charge hose connection to the vacuum
pump.
3. Fully open the
4. Operate the vacuum pump to evacuate. After starting
evacuation, slightly loose the flare nut of the low pressure
valve on the gas side and check that the air is
entering. (Operation noise of the vacuum pump changes
and a compound meter indicates 0 instead of minus)
5. After the evacuation is complete, fully close the lo handle
of the manifold valve and stop the operation of the
vacuum pump.
Evacuate for 15 minutes and more and check
that the compound meter indicates -29.92inHg(-76cmHg).
6. Turn the stem of the low pressure valve B about 45 counter-
clockwise for 6~7 seconds after the gas units out, then
tighten the flare nut again. Make sure the pressure display
in the pressure indicator is a little higher than the atmosphere
pressure.
7. Remove the charge hose from the Low pressure charge hose.
8. Fully open the packed valve stems B and A.
9. Securely tighten the cap of the packed valve.
VMH 30/36 SERIES
OUTDOOR SECTION
AIR PURGING
Pipe Size
Standard
Gas (in)
Liquid (in)
Length (ft)
*16.5 (5m)
5/8 (16mm)
3/8(9.52mm)
Lo
handle of the manifold valve.
Max
Total Line Length (ft)
Elevation (ft)
Min.
32 (9.75m)
10 (3m)
Refrigerant
Indoor
Outdoor
unit
unit
A
Gas side
C
Liquid side
D
B
Packed valve
Half union
Compound meter
-29.92 inHg
*(-76cmHg)
Lo Handle
Charge hose
Low pressure valve
O
9
Installation, Operation & Maintenance
Additional
Max.
Refrigerant oz/ft
82 (25m)
.4 (40g/m)
Flare nut
Stop
Cap
Valve body
Valve stem
Manifold valve
Pressure gauge
Hi Handle
Charge hose
Vacuum pump

Advertisement

Table of Contents
loading

Table of Contents