Step 4 Connect Range To Gas - GE Monogram ZDP48N4G Installation Instructions Manual

48", 36", 30" professional ranges
Hide thumbs Also See for Monogram ZDP48N4G:
Table of Contents

Advertisement

Installation
STEP 4 CONNECT
RANGE TO GAS
Assure that gas supply is turned off at the shut-off
valve:
• Connect flexible metal connector to incoming gas line
pipe stub located on the left side on the bottom back
of the range.
• Turn on gas and check for leaks:
- Use a liquid leak detector at all joints and
connections in the system.
_k_ CAUTION:
Do not use a flame to check for gas leaks.
MISE EN GARDE :
II ne faut pas utiliser de flamme pour
v_rifier s'il y a des fruites.
NOTE: This range is equipped with a gas shut-off valve
located behind the kick plate, This valve is to be used
in the event that service is required in the future.
I
D
u
o
o
o
o
11

Advertisement

Table of Contents
loading

Table of Contents