GE JGP628 Installation Instructions Manual page 7

36" sealed gas cooktop
Hide thumbs Also See for JGP628:
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
CHECK
FOR LEAKS
Before testing for leaks, make sure oll burner knobs
ore in the OFF position.
After connecting
the cooktop to gas, check system
for leaks with o manometer.
If a manometer
is not
available, turn the gas supply on to the cooktop
and use o liquid leak detector
at oil joints and
connections
to check for leaks.
Tighten oil connections
if necessary to prevent gas
leakage in the cooktop
or supply line.
DO NOT USE OPEN FLAME TO CHECK FOR
LEAKS!
Disconnect the cooktop
and its individual
shut-off
valve from the gas supply piping system during any
pressure testing of that system at test pressures
greater than 1/2 psig (3.5 kPa).
Isolate the cooktop
from the gas supply piping
system by closing its individual
shut-off valve
during any pressure testing of the gas supply
system at test pressures equal to or less than
1/2 psig (3.5 kPa).
INSTALLATION OVER
BUILT-IN OVEN
See built-in oven installation
for complete
installation
instructions.
I
T
I _
s,, T oCenter of
|
I
_]
2" Dia. Hole From
_
_
Countertop
90 ° Elbow
........
I ---'_--
7
_1"_
2"Dia. Hole
(20 7/8"
from front
of Countertop to
Hole Center}
Cabinet Sides

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jgp975Zgu36Jgp630Jgp963Jgp970

Table of Contents