Gas Supply Requirements - Haier CHDE5300AW User Manual And Installation Instructions

Front load gas & electric dryer
Hide thumbs Also See for CHDE5300AW:
Table of Contents

Advertisement

Available languages

Available languages

English

GAS SUPPLY REQUIREMENTS

WARNING
1. Installation MUST conform with local codes. In the absence of local codes,
installation must conform with the National Fuel Gas Code, ANSI Z223.1
(latest edition) or in Canada, the current CAN/CGA B149.1
CAUTION
2. The gas supply line should be 1/2 inch (1.27cm) pipe.
CAUTION
3. If codes allow, flexible metal tubing may be used to connect your dryer to the
gas supply line. The tubing MUST be constructed of stainless steel or plastic-
coated brass.
4. The gas supply line MUST have an individual manual shutoff valve installed
within 6 feet (183cm) of the dryer in accordance with the National Fuel Gas
Code, ANSI Z223.1/NFPA 54.
In Canada, an individual manual shut-off valve MUST be installed in
accordance with the B149.1, Natural Gas and Propane Installation Code.
5. A 1/8 inch (0.32cm) N.P.T. plugged tapping, accessible for test gauge
connection, MUST be installed immediately upstream of the gas supply
connection to the dryer.
6. The dryer MUST be disconnected from the gas supply piping system during
any pressure testing of the gas supply piping system at test pressures in excess
of 1/2 psig (3.45kPa).
7. The dryer MUST be isolated from the gas supply piping system during any
pressure testing of the gas supply piping system at test pressures equal to or
less than 1/2 psig (3.45 kPa).
9
Replace copper connecting pipe that is not plastic
ADVERTENCIA
coated. Stainless steel or plastic-coated brass
MUST be used.
ADVERTENCIA
PRECAUCIÓN
PRECAUCIÓN
ADVERTISSMENT
ATTENTION
PRECAUCIÓN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Chde5000awHde5000awHde5300awHdg5000awHdg5300aw

Table of Contents