Advertisement

ESPRIT 250
(BW-1070)
OPERATING INSTRUCTIONS

Advertisement

Table of Contents
loading

Summary of Contents for Bowens ESPRIT 250

  • Page 1 ESPRIT 250 (BW-1070) OPERATING INSTRUCTIONS...
  • Page 2 Bowens Esprit 250 Operating Instructions. 1. Sync Socket 2. Mains Inlet 3. Fuse (+ Spare Fuse). 4. Mains On/Off Switch 5. Modelling Lamp Control Switch 1. Latch Knob 2. Flash Power Control 3. ‘Ready’ Indicator 4. Photocell Cover 5. Test/Open Flash 6.
  • Page 3 Safety Notes The Esprit 250 must not be used in an environment where moisture or flammable vapour is likely to come in contact with the unit.
  • Page 4 When first switched ‘ON’ the green illuminated ON/OFF switch (Fig.1. 4) will light. When the unit has charged to the level set by the flash power selector (Fig.2. 2) the green ready LED (Fig.2. 3) will light. Your Esprit 250 is now ready to fire.
  • Page 5 OFF the Esprit 250 before changing the bulb or fuse. Fitting / Removing A Reflector A range of reflectors is available for the Esprit 250. To fit, slide the neck of the reflector over the front of the unit. Align the three pegs on the reflector with the three slots in the retaining ring.
  • Page 6 Bowens Esprit 250 Operating Instructions. to fire the green LED (Fig.2. 3) will light. Press Open Flash Pushbutton (Fig.2. 5) and check that the unit operates correctly. - 6 -...
  • Page 7 Bowens Esprit 250 Operating Instructions. - 7 -...
  • Page 8 Full to 1/4 Modelling Power Control Independent & Fully Variable Dimensions DIA. 145mm, LEN. 362mm Weight 2.9Kg (6lb 6oz) Due to our policy of constant product improvement Bowens International reserve the right to change equipment specifications without notice. - 8 -...
  • Page 9 Esprit 250 Instructions: (BW-1070) BWL-0172/5 BOWENS INTERNATIONAL LIMITED 355 OLD ROAD CLACTON-ON-SEA ESSEX CO15 3RH Tel: +44(0) 1255 422807 Fax : +44(0) 1255 436342 - 9 -...

This manual is also suitable for:

Bw-1070

Table of Contents