Garland M series Operation Manual page 10

Master series heavy duty gas ranges and char broilers, all m/ms/mst series models
Table of Contents

Advertisement

INSTALLATION Continued
5. Align and insert stud into rail center support bracket.
Assemble nut and washer to stud after alignment.
Insert counter sink screw
and nut into top of flange of
A
range. 2 sides per range
6. Final Assembly:
After rail has been assembled insert flathead screw and
nut to attach rail to top side of range.
A. Adjust rail level and position with nuts between rail
and bracket and secure adjustment with nuts below
the bracket. When adjustment is complete tighten
countersunk screw and nut.
Page 10
7. Final assembly Option: If an end enclosure is required
the end enclosure bracket should be installed during rail
assembly, step #4. Mount bracket over studs and tighten
against underside of rail (A).
End Enclosure Parts
End Enclosure Rt/Lt
A
End Enclosure Bracket
A
Part # 1382680 Rev 3 (05/10/11)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents