8
Installation details
8.1
Wrench torque sheet for installation
8.2
Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
8.3 Pipe length and the elevation
Pipe size
Capacity
Btu/h
GAS
7k/9k
3/8'' (φ9.52)
12k
1/2'' (φ12.7)
Caution:
Capacity is base on standard length and maximum allowance length is base of reliability.
Oil trap should be installed per 5-7 meters.
11
Service manual
Outside diameter
mm
inch
φ6.35
1/4
φ9.52
3/8
φ12.7
1/2
Unit
2
mm
LIQUID
1/4'' (φ6.35)
1/4'' (φ6.35)
Torque
Kgf.m
1.8
4.2
5.5
7k/9K
12K
1.0
1.5
Standard
Max.
length
Elevation
(m)
B (m)
5
5
5
5
In case that
more than 5m.
Max.
Additional
Length
refrigerant
A (m)
(g/m)
10
30
10
30