HP ProCurve 6120G/XG Installation And Getting Started Manual page 18

Hp procurve series 6120 blade switches installation and getting started guide
Hide thumbs Also See for ProCurve 6120G/XG:
Table of Contents

Advertisement

Switch Installation
2.
3.
4.
5.
N o t e
The 1000BASE-SFP, 10GBASE-XFP, and 10-GbE SFP+ ports can be used to connect to the data
center if they are populated with a supported pluggable SFP, XFP, or SFP+ optical transceiver.
See the Installing or Removing SFP (mini-GBIC) or XFP transceivers section
more information.
At this point, the switch is fully installed. See
on page 18
more detailed information, refer to the Management and Configuration Guide for the
Series 6120 Switches, which is on the HP Web site at
/documentation.
10
Prepare the Blade Switch for installation.
Install the Blade Switch into the interconnect bay.
If the enclosure configuration includes more than one Blade Switch, install the other Blade
Switches now.
Connect the data center network cables to any Blade Switch port not being used.
for switch configuration information and for some basic configuration steps. For
"Getting Started With Switch Configuration"
www.hp.com/go/bladesystem
(page
13) for

Advertisement

Table of Contents
loading

This manual is also suitable for:

Procurve 6120xgProcurve 6120 series

Table of Contents