HE CHECKS TO BE RUN BEFORE INITIAL START
FOLLOWS
1. Make sure that:
I I
F
. 3.2
IG
2. Make sure that all radiator valves are open;
3. Check the flue system for products of
4. Fill the boiler condensate trap
I I
5. Turn on the gas cock (F
6. Press the reset button "D" (see F
F
. 3.4
IG
7. Run the boiler in Hot Water mode and bleed air from the
8. Check the minimum and maximum burner pressure
:
- the screw on the automatic air valve has been loosened
when the system is full;
- If the water pressure in the system is
below 1.5 bar, bring it up to the
appropriate level;
- Ensure that the gas cock is closed
(F
. 3.1);
IG
- Make sure that the electrical
connection has been made properly and that the earth
wire is connected to an efficient earthing system;
- Supply power to the boiler by turning the On/Off knob
"A" (see F
. 3.2) - on the display will appear "on". Turn
IG
the knob "C" to maximum and switch the time clock to
constant.
After 7 seconds, the boiler will signal a shutdown due to
ignition failure. Leave the boiler as it is until all of the air
has been bled from the system.
- Loosen the cap on the head of the pump to eliminate
any air pockets;
- Repeat the procedure for bleeding the radiators of air;
- Open the hot water taps for a brief period;
- Check the system pressure and, if it has dropped, open
the filling loop again to bring the pressure back up to
1.5 bar.
combustion, tightness and stability.
with water.
N.B. In the event of a prolonged
period of system shutdown, the condensate trap
should be filled before any renewed use . A
shortage of water in the trap could temporarily lead
to fumes leaking into the air.
the connections with an approved soap solution and
eliminate any leaks.
re-attempt ignition. If the burner does not light the first
time, wait 1 minute, purge the gas and repeat the
procedure.
system
values; adjust if necessary using the values indicated in
the table in S
4 (Page 36).
ECTION
-
UP ARE AS
F
. 3.1
IG
Fig. 3.3
. 3.3) and check the seals on
IG
. 3.4) the boiler will
IG
31