Startup Logsheet - Heat Controller HKV Installation, Operation & Mainenance Manual

Commercial vertical packaged heat pump: hkv large commercial
Table of Contents

Advertisement

Heat Controller, Inc.
Installer: Complete unit and system checkout and follow unit start-up procedures in the IOM. Use this form to record
unit information, temperatures and pressures during start-up. Keep this form for future reference.
Job Name: ________________________________ Street Address: _____________________________________
Model Number: ____________________________ Serial Number: ______________________________________
Unit Location in Building: _______________________________________________________________________
Date: ________________________________ Sales Order No: __________________________________________
In order to minimize troubleshooting and costly system failures, complete the following checks and data entries before
the system is put into full operation.
Temperatures:
Pressures:
Entering Fluid Temperature
Leaving Fluid Temperature
Temperature Differential
Return-Air Temperature
Supply-Air Temperature
Temperature Differential
Water Coil Heat Exchanger
(Water Pressure IN)
Water Coil Heat Exchanger
(Water Pressure OUT)
Pressure Differential
Compressor
Amps
Volts
Discharge Line Temperature
(After 5 Minutes)
Motor
Amps
Volts
Do not connect gage lines
HKV LArge CommerCiAL
F
C
PSIG
kPa
Cooling Mode
DB
DB
WB
WB
40
IOM Instructions
Start-up Sheet Log
Heating Mode
DB
DB
WB
WB