GE ZET1 Installation Instructions Manual page 4

30" built-in wall oven
Table of Contents

Advertisement

Installation Instructions
Pre-lnstallation
Checklist cont
To Remove the Door (if necessary)
Door removal is not a requirement
for
Ilk _1_
installation of the product, but is an
added convenience.
To remove the door:
Open the oven door as far as it will go.
Push both hinge
Hinge
_._L.
Unlocked
locks down toward
.,_!!_.
Position
the door frame,
Hinge"_/'_
to the unlocked
s_ot q_V_
position. This may
require a flat blade
Hinge
screwdriver.
Arm
Place the oven on a table or platform
even with the cutout opening.
(Platform
must support
175 Ibs.
[79 kg] single, 350 Ibs. [159 kg]
double.)
Remove the bottom trim from the top
of the oven. It will be installed at the
end of the installation
process. The
trim is wrapped
separately
and taped
to the top of the unit.
DO NOT LIFT THE DOOR
BY THE HANDLE!
i]
Place hands on both sides of
the door, and close the oven
_
IIil
door to the removal position, _/._
IIil
which is most of the way.
_\_ii
Removal Position
[_
Lift door up
and out until
the hinge arms
clear the slots.
Hinge Clears Slot
NOTE: The oven door is very heavy. Be sure
you have a firm grip before lifting the oven
door off the hinges. Use caution once the
door is removed. Do not lay the door on its
handle. This could cause dents or scratches.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zet2

Table of Contents