Suggested Tool Requirements; Prepa Ration Of Chassis - HAMPTON BAY HBLG18H Owner's Manual

Room air conditioner
Table of Contents

Advertisement

A2001£,/;,
;:
) 95,:]_284_;(s:Pt_
....
1!2
+
Suggested Tool Requirements
I
PREPA RATION OF CHASSIS
1 Remove the screws which fasten the cabinet at
both sides and at the back.
SCREWDRIVER(+,-),
RULER,
KNIFE,
HAMMER,
PENCIL,
LEVEL
Shipping screws
2. Slide the unit out from the cabinet by gripping the
base pan handle and pulling: forward while
bracingthe cabinet.
3. Cut the window sash seal to the proper length,Peel
off the backing and attach the Foam-PE to the
undersideof the window sash,
4. Remove the backing from Foam-PE with 3 holes
and attachit to the bottomof the Top retainerbar.
5. Attach the Top retainerbar on the top of the
cabinet with 3 screws (TypeA).
6. Insert the Frame guides into the bottom of the
cabinet.
7. Insertthe Frame Curtain into the Top retainer bar
and Frameguides.
8. Fasten the curtains to the unit with 10 screws
(Type A) at both sides.
Fig. 2
Top retainerbar
Foam-PE
Top retainer mr
Screw
(Type A)
Screw(Ty_ A)
"Frameguide
Fig;. 4
÷

Advertisement

Table of Contents
loading

Table of Contents