Samsung SGH-E390 Service Manual page 22

Gsm telephone
Hide thumbs Also See for SGH-E390:
Table of Contents

Advertisement

― Assembly
1
1. Prepare the slide upper and LCD module.
3
Verify White silk line
1. Put the 2 kinds of rubber on rubber hole.
2. At first combine LCD connector to sub-PBA
according to the picture.
※ Folding position
SAMSUNG Proprietary-Contents may change without notice
This Document can not be used without Samsung's authorization
Exploded View/Disassembly&Assembly Instructions
2
1. At first, attach LCD to main window.
2. Put the camera module and speaker
module(blue circle).
3. And put EMI tape on sub-PBA(blue).
4
1. At first put insulation tape on connector.
2. And put insulation tape on connector.(Red)
(after folding FPCB)
5-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents