Assembly - Samsung SGH-D900 Service Manual

Gsm telephone
Hide thumbs Also See for SGH-D900:
Table of Contents

Advertisement

11-2 Assembly

― Con Type
1
1. Prepare the slide upper and LCD module.
3
1. At first put the speaker and motor module.
2. And put the camera at slide upper. (Red)
3. And combined camera connector to sub-PBA.
(Blue)
4. And put insulation tape on connector.
SAMSUNG Proprietary-Contents may change without notice
This Document can not be used without Samsung's authorization
Disassembly and Assembly Instructions
2
1. At first attach LCD to main window and put
the sub PBA considering sub hook(blue circle).
4
Verify White silk line
1. At first combined LCD connector to sub-PBA
accoding to picture.
2. And put insulation tape on connector.
11-7
※ Folding position

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents