Download Print this page

Masonry Construction - Frigidaire L0806995 Installation Instructions Manual

Heavy duty and median air conditioners

Advertisement

OPTIONAL:
Caulking and installation
of trim on interior
wall may be done. You can buy wood from your local lumber
or hardware supply. On the outside, caulk openings
around top
and sides of cabinet, and all sides of wood sleeve to the opening.
NOTE:
See Step 7, Item 3 of Window Mounting
Instructions
for bottom rail seal location.
Masonry Construction
1. Cut or build a wall opening in the masonry wall similar
to the frame construction(refer
to Step 2 d Thru-the-Wall
Installation for a wall thickness
greater than 8-1/2").
2. Secure cabinet in place using masonry nails, or the right
masonry anchor screws.(Another
way to do this is to build
an in -between frame of2x4 's as shown in the Step 2 Prepare
Wall illustrations-but
make it double framed on either side,
and install between masonry wall opening and cabinet.
Frame must be securely anchored to masonry wal! opening)
This way gives very good louver clearance on either side of cabinet.
3. Install a linted to support masonry wal! above cabinet.
Existing holes in cabinet can be used and/or additions holes
can be drilled to fasten cabinet at various positions.Be
sure
that side louver clearance is in accordance
with Step 1above.
4. Install exterior cabient suppport brackets as shown in
Step 2 d Thru-the-Wall
Installation.Caulk
or flash if
neede, to provide a wether-tight
seal around top and sides
of cabinet.
5. To complete installation, apply wood trim molding
around room side projection d cabinet.
8

Advertisement

loading

This manual is also suitable for:

Fas seriesFam series