Pre-Startup Checklist - Trane VUV Installation, Owner Maintenance

Vertical unit ventilator
Table of Contents

Advertisement

Pre-Start-up Checklist
Before energizing the unit, the following system devices must be checked:
____ Is the high voltage power supply correct and in accordance with the nameplate ratings?
____ Is the field wiring and circuit protection the correct size?
____ Is the low voltage control circuit wiring correct per the unit wiring diagram?
____ Is the piping system clean/complete and correct?
____ Is unit serviceable? (See clearance specifications on page 7).
____ Are all the unit access panels secure and in place?
____ Is the water flow established and circulating through all the units?
____ Is the condensate line properly sized, run, trapped and pitched?
____ Does the indoor blower turn freely without rubbing?
____ Has all work been done in accordance with applicable local and national codes?
____ Has heat transfer fluid been added in the proper mix to prevent freezing if required?