Installation sequence
Installing the boiler and making all connections
Condensate connection
A
Filling the siphon with water
10
Connect condensate drain A with a
slope and pipe vent to the public sewer.
Observe the local waste water regula-
tions.
Note
Fill the siphon with water before com-
missioning.
Fill the flue gas connection with a mini-
mum of 0.3 l of water.
!
Please note
During commissioning, flue gas
may be emitted from the conden-
sate drain.
Fill the siphon with water imme-
diately prior to commissioning.
(cont.)