Installation Site; Transporting The Machine To Its Installation Site; Building Under A Continous Worktop / In A Kitchen Run - Miele T 220 Operating Instructions Manual

Novotronic vented tumble dryer
Hide thumbs Also See for T 220:
Table of Contents

Advertisement

Installation and connection

Installation site

,
Make sure the dryer door can be
opened without hindrance after
installation.
Transporting the machine to its
installation site
When moving the machine you can
hold it by the lid where it protrudes to
the rear of the dryer. To manoeuvre the
dryer out of its packing case to its
installation site you will also need to
hold it by the front feet.
Building under a continous worktop /
in a kitchen run
The space required by the vent duct
must be taken into consideration when
calculating the distance between the
machine and a wall or other appliances
or furniture on either side.
,
A building under kit* is required
which must be fitted by a suitably
qualified person.
The machine lid is replaced by a
coverplate.
It must be fitted by suitably qualified
person to ensure electrical safety.
The building-under kit is supplied with
its own installation instructions.
N.B. When built under drying times may
be longer.
– The electrical socket must be
located in an accessible position
near the machine.
26
With niche heights of:
– 840 mm, longer screw feet* are
required.
– 870/885 mm - 915/930 mm, one or
two height adjustment frames* are
required.
* Available as an optional accessory
from your Miele dealer or the Miele
Spare Parts Department.
If you wish to push your machine under
a worktop and there is space to do this
without removing the lid, the building
under kit is not necessary. Otherwise
the building under kit is essential.
Replacing the lid
If the lid has been removed in order to
fit a coverplate, ensure that, if the lid is
ever replaced, it fits securely into the
rear holders. Otherwise, it is not
properly secure for transport.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents