Seagate Elite 9 Installation Manual page 17

Hide thumbs Also See for Elite 9:
Table of Contents

Advertisement

Elite 9 Installation Guide, Rev. B
DC power requirements for ST410800N/ND drives
5
Voltage regulation
Max operating current
1
DC 3
1, 12
Avg idle current DC X
Max starting current
3, 6
Peak DC 3
3
Peak AC 3
Delay motor start
1, 4
Max DC 3
Peak operating current
1, 10
Typical DC X
1
Max DC 3
Max (peak) AC 3
Track following at
1
OD DC X
1
ID DC X
Read track
1, 14
OD DC 3
AC 3
Seeking
1, 13
Typical DC X
1
Max DC 3
Max (peak) AC 3
Single-ended
Differential
11
11
5V
12V
5V
2
5%
5%
5%
Amps
0.95
1.85
1.4
0.665
1.57
0.71
0.98
4.8
1.0
5.12
0.98
0.25
1.0
0.93
1.69
1.32
0.95
1.85
1.4
1.19
2.89
1.58
0.94
1.6
0.99
0.92
1.9
0.98
0.96
1.8
1.45
1.37
1.9
1.64
0.95
1.95
0.99
0.99
2.1
1.02
1.15
2.85
1.49
15
12V
2
5%
1.85
1.57
4.8
5.12
0.25
1.69
1.85
2.89
1.6
1.9
1.8
1.9
1.95
2.1
2.85

Advertisement

Table of Contents
loading

This manual is also suitable for:

St410800nSt410800ndSt410800wSt410800wd

Table of Contents