Page 1
This supplement instruction is to be used in combination with the standard accompanying GCL-GH Installation Manual. This supplement contains installation instruction and illustrated ™ parts breakdowns which specify parts included in the GCL-GH ™ NEMA 4 & 4X assemblies. IMPORTANT: Prior to installing or operating an GCL-GH ™...
High Voltage Wiring (SUPPLEMENT TO SECTION 5 OF THE ACCOMPANYING GCL-GH ™ INSTALLATION MANUAL) Line Voltage Wiring Fig. 1 Figure 1 LINE INPUT LINE 208/240V 480/575V TERMINALS GROUND WARNING • DO NOT apply power to operator until instructed to do so.
Low Voltage Wiring (SUPPLEMENT TO SECTION 5 OF THE ACCOMPANYING GCL-GH ™ INSTALLATION MANUAL) Low Voltage Control Wiring (general) Fig. 2 ROUTE LOW VOLTAGE WIRING 1) Connect all LOW VOLTAGE control circuit wires to this side IN THE SHADED AREA AS SHOWN of unit using 1/2”...
Page 4
5) Feed cable out through new side and attach rubber boot to hole. 6) Slide cable bracket onto cable and attach to new side of enclosure with 2 nuts. 7) Replace gasket, cover plate and 4 screws. Figure 5 GCL-GH www.geniecompany.com 06-12 Heavy Duty Operator...
Page 5
NEMA 4 & 4X Electric Box Parts Breakdown (SUPPLEMENT TO APPENDIX A OF THE ACCOMPANYING GCL-GH ™ INSTALLATION MANUAL) Item Part Number Description 111116.0001 BRACKET, MOUNTING, ELECTRIC BOX 111119.0001 ELEC BOX, N4 (BLACK) 111119.0002 ELEC BOX, N 4X (STAINLESS STEEL) 111397.0002...