Installingthe Discharge Chute - MTD 19AT0004OEM Operator's Manual

Twin rear bagger
Table of Contents

Advertisement

Installingthe Discharge Chute
1.
Reinstall cutting deck onto the tractor reversing the instructions
for Deck Removal in operator's manual of the tractor.
2.
Raise the deck to its highest
position.
3.
Raise the chute deflector
(A in Fig. 4-23) on the deck and
hold it while you position
the discharge
chute over the
chute opening.
7_
F
Installthe
chute adapter ontothe
chute elbow by lining upthe
tabs and sliding the adapter over the chute elbow, as in
Fig. 4-25. Secure the chute adapter
by installing
the two
ratchet
clips included
in the hardware
pack into the holes
provided.
Figure 4=23
4.
Insert the hinge pin of the discharge
chute into the tube on
the chute stop bracket. See B in Fig. 4-23.
5.
Rotate the chute a round the deck so that its front edge fits
snugly into the deck opening.
Lower the chute deflector
slowly (C in Fig. 4-23).
6.
Attach the retainer strap on the discharge
chute to the
retainer
clip on the deck. Refer to Fig. 4-24.
Note: For the chute elbow to be properly
installed,
the bottom
edge must fall over the bottom
of the deck opening
and the tab
on top of the elbow should
rest above
the deck opening.
IMPORTANT: If the retainer clip is not present on the mowing deck, on
some units, one has been included with hardware pack 689-00094A.
Attach the retainer hook (16606) with a self-tapping
screw (710-0599),
from hardware pack 689-00094A
in the position noted in Fig. 4-24.
Figure 4=25
8.
Peelthe backing offoftheself-ad
hesivefoam
strip(721-04388)
that has been included
with your grass collector.
Apply it to
the upper chute, flush against the flange
as shown in Fig.
26.
F
Figure 4-26
SECTION
4 --
ASSEMBLY &
INSTALLATION

Advertisement

Table of Contents
loading

This manual is also suitable for:

19a70004oem

Table of Contents