Install Valve Drain Hose; Install Salt Storage Tank Overflow Hose; Test For Leaks - GE GXSH40V Owner's Manual And Installation Instructions

Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions.
INSTALL VALVE DRAIN HOSE
1. Measure and connect the 3/8"drain line
(provided) to the water softener valve drain
fitting. Use a hose clamp to hold the hose in
place.
NOTE: Avoid drain hose runs longer than 30 feet.
Avoid elevating the hose more than 8 feet above
the floor. Make the valve drain line as short and
direct as possible.
IMPORTANT: If codes require a rigid drain line
see"Valve Drain requirements" section.
2. Route the drain hose or copper tubing to the
floor drain or other suitable drain point. Secure
drain hose. This will prevent "whipping" during
regenerations. See "Air Gap Requirements"
section (Figure 1).
3. Cut and secure the hose.
NOTE: The softener will not work if the water
cannot exit the drain hose during recharge.
INSTALL SALT STORAGE TANK OVERFLOW
HOSE
1. Measure, cut to needed length and connect the
3/8"drain line (provided) to the salt storage tank
overflow elbow and secure in place with a hose
clamp.
2. Route the hose to the floor drain, or other
suitable drain point no higher than the drain
fitting on the salt storage tank (This is a gravity
drain). If the tank overfills with water, the
excess water flows to the drain point. Cut the
drain line to the desired length and route it
neatly out of the way.
IMPORTANT:For proper operation of the water
softener, do not connect the water softener valve
drain tubing to the salt storage tank overflow hose.
TEST FOR LEAKS
To prevent air pressure in the water softener and
plumbing system, complete the following steps in
order:
1. Fully open two or more softened cold water
faucets close to the water softener, located
down stream from the water softener.
2. Place the bypass valve (single or 3 valve)into
the'bypass" position. SeeFigures on Page Z0.
3. Slowly open the main water supply valve. Run
water until there is a steady flow from the
opened faucets, with no air bubbles.
/4.Place bypass valve(s)in "service" or soft water
position as follows:
• Single bypass valve (Figure/4): Slowly move
the valve stem toward "service," pausing
several times to allow the water softener to
fill with water.
• 3 valve bypass (Figure 5): Fully close the
bypass valve and open the outlet valve.
Slowly open the inlet valve, pausing several
times to allow the water softener to fill with
water.
5. After about three minutes, open a hot water
faucet until there is a steady flow and there are
no air bubbles, then close this faucet.
6. Close all cold water faucets and check for leaks
at the plumbing connections that you made.
7. Check for leaks around clips at softener's
inlet and outlet. If a leak occurs at a clip,
depressurize the plumbing (turn off the water
supply and open faucets) before removing clip.
When removing clips at the softener's inlet
or outlet, push the single bypass valve body
toward the softener (See Figure 1/4). Improper
removal may damage clips. Do not reinstall
damaged clips.
If removing
clips .....
Figure 14
.... d epressurize the
plumbing, then push
Bypass Valve body
toward softener
14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gxsh45v

Table of Contents