Advertisement

Figure 16. Typical Pond Heat Exchanger Configurations
Concrete
Blocks
for
weight
Nylon Cable
Ties to
secure
blocks
300 ft coil
per ton
separated
by scrap
pipe
Slab on Grade Construction
New Construction: When possible, position the pipe in
the proper location prior to pouring the slab. To prevent
wear as the pipe expands and contracts, protect the pipe
with a layer of insulation as shown in Figure 17. When
the slab is poured prior to installation, create a chase
through the slab for the service lines with 4 inch PVC
street elbows and sleeves.
Figure 17. Slab on Grade Entry Detail
Insulation
Loop Pipe
Nylon Cable
Netting and
8-10 Bricks
4 ft
between
coils
Traditional
Coiled Pond Loop
- Southern
Climates

BUILDING ENTRY

Finished Grade
4-6'
Reverse
Return
Header
3 foot
separation
Heavy Duty
Plastic
Safety
matting
Ties to
secure
bricks
for weight
300 ft
slinky coil
per ton
High Efficiency
Slinky/Matt Pond
Loop - Northern
Climates
Retrofit Construction
Trench as close as possible to the footing. Bring the loop
pipe up along the outside wall of the footing until it is
higher than the slab. Enter the building as close to the
slab as the construction allows. Shield and insulate the
pipe to protect it from damage and the elements as shown
in Figure 18.
Figure 18. Retrofit Construction Detail
19
Enter Building As
Soon As Possible
Insulation Inside
Protective Shield
Finished Grade
4-6'
Loop Pipe