Operating Instructions; Pre-Start Checklist; Standard Fluid Measurement - Snapper LE3170R Safety Instructions & Operator's Manual

L.e. single stage small frame snow thrower series 0
Hide thumbs Also See for LE3170R:
Table of Contents

Advertisement

Section 2 - OPERATING
INSTRUCTIONS
2.1
PRE-START CHECK LIST
Make the following checks and perform the service
required before each start-up.
2.1.1. Check guards, chutes, deflectors and covers to
make sure all are in place and securely tightened.
2.1.2. Check auger control to insure it works freely.
See Figure 2.1.
AUGER
CONTROL
STANDARD FLUID MEASUREMENT (32:1 Ratio)
GASOLINE
2 CYCLE OIL
(Gallons)
(Ounces)
0.25
1.00
0.50
2.00
0.75
3.00
1.00
4.00
1.25
5.00
1.50
6.00
2.00
8.00
METRIC FLUID MEASUREMENT (32:1 Ratio)
ENGAGE AND
DISENGAGE AUGER
CONTROLTOINSURE
PROPER OPERATION
GASOLINE
2 CYCLE OIL
(Liters)
(Cubic Centimeters)
0.50
15.63
1.00
31.26
1.50
46.88
2.00
62.50
2.50
78.15
3.00
93.75
4.00
125.00
FIGURE 2.1
2.1.3.
Check
chute
operation.
Rotate
chute
insure smooth rotation throughout its range.
to
FIGURE 2.2
(Continued on Next Page)
WARNING
Use approved fuel container.
DO NOT smoke near
open fuel container. DO NOT fill fuel tank indoors or
when engine is running. Allow engine to cool for at
least
ten
minutes
before
refilling.
Wipe
off any
spilled
fuel
before
starting
engine.
DO NOT run
engine indoors.
2.1.4.
Mix fresh, good quality unleaded gasoline and
SNAPPER 2-cycle engine oil or equivalent. Mix fuel
and oil to a 32:1 ratio. See Figure 2.2.
2.1.5. Add premix fuel to tank after pushing the
machine outside where fumes can safely dissipate.
Make sure cap is tightened after refueling. Refer to
Engine Owners Manual for specifications.
2.1.6.
Check auger housing,
must be free of all
obstructions.
Clean engine of any accumulation
of
spilled fuel, dirt, etc.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Le3190rLe3190e

Table of Contents