Maintenance - Craftsman 919.679470 Owner's Manual

120/240 volt-4750 watt generator
Hide thumbs Also See for 919.679470:
Table of Contents

Advertisement

On the engine there is a choke/run bver. Hace this
_ Hug in the desired 120 or 240 voRs toob.
bver to the choke position.
@
FULL CHOKE
POSITION
_
CHOKE
LEVER
. o _ ,*_ _,-'_l!lP_ _% L
Grasp the starter handb and pull rope out showily
untii it pulls harder. Let the rope rewind showily.
Then pull rope with a rapid full arm stroke. Let rope
return to starter sbwiy.
When engine starts, gradually move choke Hoverto
"Choke Position".
If the engine fails to start after (3) pulls, move the
choke lever to the beginning choke position and pull
start rope again.
For hot engine starts make sure choke lever is in the
choke position.
Connecting
EJectrieaJ
Loads
Let engine run and warm up for about five minutes
after starting.
DO NOT connect 240 volt equipment to the 120 volt
duplex receptacbs.
DO NOT connect 3-phase loads to the panel
receptacbs.
|MPORTANT:
You should always add up the rated
watts of all lights, tools and appliances you are power-
ing at one time. This total should not exceed the rated
capacity of your generator or circuit breaker rating of
the receptacle supplying power.
Stopping
The Pngine
Disconnect all electrical loads.
Switch the start/off switch to the off position.
_ToP
\
|MPORTANT:
Never store engine with fuel in tank,
indoors, or in enclosed,
poorly ventilated
areas or where
fuel fumes may reach an open flame.
CUSTOMER
RESPONSIBILITIES
TABLE
i
Every 25
Every 50 Hours
Before each
Hours of
of Every
Every 100 Hours of
use
Every
Season
Every Season
MAINTENANCE
TASK
Season
i
X
See Note 2
See Note 1
X
X
Check oil level
Change oil
Clean Air Filter Assembly
Check Spark Plug
Prepare
Unit for Storage
X
Prepare
unit for storage
if it is to remain
idle for more than 30 days.
Note 1: Change oil after first two (2) operating hours and every 50 operating hours thereafter, more often if operated in
extreme dusty or dirty conditions.
Note 2: Check oii after 5 hours of operation (See page 13 - Oii Maintenance.)
12
ENG

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents