HP StorageWorks 8B - FC Entry Switch Reference Manual page 18

Fc 1gb/2gb
Hide thumbs Also See for StorageWorks 8B - FC Entry Switch:
Table of Contents

Advertisement

2
Installing and Configuring the Switch
c.
Note:
Figure 2-5
6.
Assemble each of the two inner rails (one on each side of the switch and plenum) using eight
#8-32 x 5/16 Phillips pan-head screws (with attached star lock washers) and eight #8 flat
washers as shown in
CAUTION
lengths can cause damage to internal components of the switch. Be sure to install the flat washers
along with the pan-head screws. Before tightening screws, make sure that the rails are centered to
the overall height of the switch.
Figure 2-6
2-8
Install one M5 Torx screw in the upper hole location of the right rail. Then, install one M5
Torx screw in the lower location of the left rail. See
Do not install the upper left and lower right screws until later.
Assembling the Outer Rails
Figure
2-6.
Do not use any other screws other than the eight that are provided. Use of any longer
Assembling the Inner Rails
Figure
2-5.
Installation and Reference Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

SurestoreFc 1gb switch 8bFc 2gb switch 8b

Table of Contents