SRX2, SRX3 and SRX4
Rack Mount Fixed And Roll-Out Shelves
CLIP NUT INSTALLATION
Clip Nuts provide mounting points for rack mount
fixed and roll-out shelves.
Clip nuts have a front or screw side. Consider which
way it should face for ease of access to the screw
head during component installation. (figure 1)
To remove a clip nut from a mounting angle, insert a flat
blade screwdriver or knife under the tab on the front and
pry up, freeing the retaining ring from the mounting
angle. (figure 2)
1. Select the location at which the shelf will be mounted
in the enclosure assembly.
2. Snap one clip nut into the top hole of the selected
location.
(note: When mounting a roll-out shelf, insert a
10-32 screw partially into each clip nut.)
If the weight load will exceed 75 lbs. on a roll-out shelf,
use four clip nuts and screws in each of the brackets.
It will be necessary to select a four-hole grouping that
matches the mounting holes in the brackets. The center
two holes will measure 1/2" apart.
Two screws per bracket, one at the front and one at the
rear, is sufficient if the weight load will be less than
75 lbs.
3. Measure from the bottom of the Mounting Angle to the
top clip nut. Assemble clip nuts onto the three other rails
at the measured height.
Manual Part #93-1937
01/18/02 rev. A
Rack Mount Fixed And Roll-Out Shelves
#10-32 x 5/8" Pan
Head Machine Screw
1
Clip nut
Front or screw side
Figure 1
Mounting angle
Clip nut
Figure 2