Remote Control Panel And Wiring - Greenheck ERV-251ERV-361 Installation, Operation And Maintenance Manual

Energy recovery ventilators
Table of Contents

Advertisement

Remote Control Panel and Wiring

Schematics
The remote panel is available with a number of
different alarm lights and switches to control the unit.
The remote panel ships loose and requires mounting
and wiring in the field
The remote panel is available with the following
options:
Refer to Electrical Connections section for Field Control
Wiring recommendations.
7-Day Timer or On/Off Switch
7-Day Timer
S1 - Unit On/Off
For 7-Day Timer, use blue and black wires.
Red wires should be capped off.
Hand/Off/Auto Switch
On
Off
BMS
Auto
Hand/Off/Auto Switch allows the unit to
"Off" - off
"On" - Manual Operation
"Auto" - Unit is controlled by BMS, RTU, etc.
NOTE: RTU controllers are by others.
20
Energy Recovery Ventilator
R
Terminal Block
in Unit
C
Control Center
G
R
Terminal Block
C
in unit
Control Center
G
Indicator Lights powered by the ER Unit
R
C
G
Y1
Y2
W1
6
7
12
PS2
NC
C
NO
PS3
NC
C
NO
Dirty Filter Indicator (power by others)
PS2
NC
C
PS3
NC
C
Hot
L1
Refer to Pressure Switch for voltage and load ratings.
Unit On/Off
Frost Control
Economizer
Rotation Sensor
Supply Dirty Filter
Exhaust Dirty Filter
Supply Dirty Filter
NO
Exhaust Dirty Filter
NO

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Erv-521Erv-581Erv-522Erv-582Erv-251Erv-361

Table of Contents