Built-In Fireplace Installation - White Mountain Hearth VFHS-20R-4 Installation Instructions And Owner's Manual

The vail unvented gas fireplace
Table of Contents

Advertisement

BUILT-IN FIREPLACE INSTALLATION

Built-In Fireplace Installation
Built-in installation of this fireplace involves installing fireplace
into a framed-in enclosure. This makes the front of fireplace flush
with wall. If installing a mantel above the fireplace, you must follow
the clearances shown in Figure 5, page 9. Follow the instructions
below to install the fireplace in this manner.
Frame in rough opening. Use dimensions shown in Figure 10 for a
conventional rough opening. Use dimensions shown in Figure 11
for corner rough opening. Be sure to provide gas line for fireplace
and electrical power for VFS-BK optional blower assembly.
1. Attach two (2) nailing flanges to firebox sides with two (2) 10
x 1/2" screws for each nailing flange.
2. Gas line connections must be made at this time. When facing
the appliance the gas supply will enter on right-hand side. See
"Gas Supply" Page 8.
3. Insert fireplace into enclosure.
4. Attach nailing flanges to framing with a screw or nail.
5. Finished wall surface will be flush to the leading edge of
fireplace top and sides.
6. Installation of built-in fireplace is completed.
Installation of Brass Trim
1. Lower bottom louver.
2. Remove screen from fireplace.
3. Remove top louver from fireplace [two (2) Phillips screws].
4. Attach right and left brass trim, sides to fireplace. Use two (2)
Phillips screws for each side.
5. Attach brass trim top to fireplace with two (2) Phillips
screws.
Rough Opening for Installing in Wall ( Figure 10)
Figure 10
16717-2-0605
Rough Opening for Installing in Corner ( Figure 11)
Figure 11
Figure 12
Page 11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vfhs-20/10t-4Vfhs-20t-4Vfhs-10t-4

Table of Contents