Event Scheduling - Dukane 8755N User Manual

Hide thumbs Also See for 8755N:
Table of Contents

Advertisement

7.3 Event Scheduling

The scheduling function enables to setup scheduled events including power on /
power off. It enables to be "self-management" projector.
NOTE
• You can schedule the following control events: Power, Input Source,
My Image, Messenger, Slideshow. (&28)
• The power on event has the lowest priority among the all events that are
defined at the same time.
• There are 3 types of Scheduling, 1) daily 2) weekly 3) specific date. (&27)
• The priority for scheduled events is as follows 1) specific date 2) weekly 3)
daily.
• Up to five specific dates are available for scheduled events. Priority is given to
those with the lower numbers when more than one event has been scheduled
for the same date and time (e.g., 'Specific date No. 1' has priority over 'Specific
date No. 2' and so on.
• Be sure to set the date and time before enabling scheduled events. (&30)
Once you turn off the projector in the SAVING mode (&SETUP menu in the
Operating Guide) or the AC power, the current date and time setting is reset.
7. Other Functions
59

Advertisement

Table of Contents
loading

This manual is also suitable for:

8929w892889308931w8937

Table of Contents