Timing The Opening - Duerkopp Adler 975-1-5 Service Instructions Manual

Hide thumbs Also See for 975-1-5:
Table of Contents

Advertisement

2.4.3 Timing the Opening

12
1
2
The middle piece should be opened at the moment the thread slips
through between the middle piece 2 and its holder 1.
Caution Risk of Injury !
Conduct adjustment work and function testing only with greatest
possible caution.
Lower the sewing head.
Set the program switch to 44 and press the " STOP " key.
The sewing head is lowered and the needle plate and pressure
foot raised.
Loosen screw 3.
With the handwheel bring the needle bar 1 mm behind the upper
dead center (seen in the direction of run).
Turn eccentric 4 until the finger is at the forward reversing point.
The middle piece 2 must be completely open.
Tighten screw 3.
3
4

Advertisement

Table of Contents
loading

Table of Contents