Horizontal Left (Supply-Air Discharge) Applications - Bryant 345MAV Installation, Start-Up, And Operating Instructions Manual

Series f 4-way multipoise fixed-capacity condensing gas furnace
Table of Contents

Advertisement

2. Use smaller diameter tube (factory-supplied in loose parts
bag) to extend collector box pressure tube (green label)
which was previously connected to condensate trap relief
port connection.
3. Connect collector box pressure tube (green label) to pres-
sure switch connection labeled "collector box."
4. Use remaining smaller diameter tube (factory-supplied in
loose parts bag) to extend collector box pressure tube (pink
label) which was previously connected to pressure switch.
5. Route this extended tube (pink label) to condensate trap
relief port connection.
6. Determine appropriate length, cut, and connect tube.
7. Clamp tube to relief port connection.
E. Condensate Trap Freeze Protection
Refer to Condensate Drain Protection section for recommenda-
tions and procedures.
IV. HORIZONTAL LEFT (SUPPLY-AIR DISCHARGE)
APPLICATIONS
A horizontal left furnace application is where furnace blower is
located to the right of combustion and controls section of furnace,
and conditioned air is discharged to the left.
NOTE: The auxiliary junction box (J-Box) MUST be relocated to
opposite side of furnace casing. (See Fig. 10.) See Electrical
Connection section for J-Box relocation.
A. Condensate Trap Location
The condensate trap must be removed from the factory-installed
blower shelf location and relocated in selected application location
as shown in Fig. 2 or 10.
To relocate condensate trap from the blower shelf to desired
location, perform the following:
AUXILIARY "J" BOX
CONDENSATE
RELOCATE TUBE BETWEEN BLOWER SHELF AND INDUCER HOUSING FOR
PLUG
TRAP
COLLECTOR
BOX EXTENSION
DRAIN TUBE
040, 060, AND 080 HEATING INPUT FURNACES
Fig. 10—Horizontal Left Tube Configuration
1. Remove 3 tubes connected to condensate trap.
2. Remove trap from blower shelf by gently pushing tabs
inward and rotating trap.
3. Install casing hole filler cap (factory-supplied in loose parts
bag) into blower shelf hole where trap was removed.
WARNING: Casing hole filler cap must be installed in
blower shelf hole when condensate trap is relocated.
Failure to follow this warning could result in electrical
shock, fire, personal injury or death.
4. Install condensate trap into casing hole by inserting tube
connection stubs through casing hole and rotating until tabs
snap into locking position.
5. Fill unused condensate trap casing holes with plastic filler
caps (factory-supplied in loose parts bag).
B. Condensate Trap Tubing
NOTE: See Fig. 10 or tube routing label on main furnace door to
check for proper connections.
1. Collector Box Drain Tube
a. Install drain tube coupling (factory-supplied in loose
parts bag) into collector box drain tube (blue label)
which was previously connected to condensate trap.
b. Connect large diameter drain tube and clamp (factory-
supplied in loose parts bag) to drain tube coupling,
extending collector box drain tube.
c. Route extended tube (blue label) to condensate trap and
cut to appropriate length.
d. Clamp tube to prevent any condensate leakage.
CAP
COLLECTOR BOX
DRAIN TUBE
(BLUE AND WHITE STRIPED)
COLLECTOR BOX
EXTENSION TUBE
DRAIN TUBE COUPLING
COLLECTOR BOX TUBE (PINK)
—9—
COLLECTOR BOX
TUBE (GREEN)
INDUCER HOUSING
DRAIN TUBE (VIOLET)
COLLECTOR BOX
DRAIN TUBE (BLUE)
A00215