Figure 7 Wall Mounting Instructions; Figure 8 Wall Mounting Instructions - Bard CH4S1 Installation Instructions Manual

Wall mounted package heat pumps
Table of Contents

Advertisement

Exterior wood or
steel siding wall
Factory supplied rain
flashing. Attach to
unit before installing.
"CH" Unit
3" MIN. TO OVER HANG OR EAVES
FIGure 7
Wall mOuntInG InstructIOns
Interior finished wall
Follow all local building codes
!
when framing wall to support unit.
FIGure 8
Wall mOuntInG InstructIOns
44 7/8"
29 7/8"
Supply Opening
9 13/16"
1" clearance
6 1/8"
Return Opening
15 7/8"
1" clearance
51 1/4"
C L
Follow all local building codes
!
when framing wall to support unit.
Supply opening
Framing material:
2x4's, 2x6's, and/or
structural steel
MIS-2024 A
Locate stud to match
spacing for rest of wall.
A second member may
be required for some
walls.
These structural
members must be
able to support the
entire weight of the
unit.
MIS-2025 A
Return
opening
Manual 2100-455M
Page
13 of 28

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ch3s1Ch5s1

Table of Contents