Installing A New Fiber Optic Module; Cabling A Fiber Optic Module; Fiber-Optic Connectors; Replacing A Power Supply - Dell PowerConnect B-TI24x Hardware Installation Manual

Powerconnect b series
Table of Contents

Advertisement

7.

Installing a new fiber optic module

You must install a fiber optic module (SFP+ or SFP transceiver) in each 10-Gigabit Ethernet fiber
port you want to use. You can install a new fiber optic module in a port while the PowerConnect
B-Series TI24X device is powered on and running.
To install a fiber optic module, you will need an ESD wrist strap.
DANGER
For safety reasons, the ESD wrist strap should contain a series 1 meg ohm resistor.
Follow the steps to install a fiber optic module.
1. Put on the ESD wrist strap and ground yourself by attaching the clip end to a metal surface
2. Remove the new module from its protective packaging.
3. Gently insert the fiber optic module into the port until the module clicks into place. The module

Cabling a fiber optic module

Follow the steps to cable a fiber optic module.
1. Remove the protective covering from the fiber-optic port connectors and store the covering for
2. Before cabling a fiber optic module, Dell strongly recommends that the cable connectors and
3. Gently insert the cable connector or connectors (a tab on each connector should face upward)
4. Observe the link and active LEDs to determine if the network connections are functioning

Fiber-optic connectors

To avoid problems with the connection between the fiber optic module (SFP+ or SFP) and the fiber
cable connectors. When not using an SFP+ or SFP connector, make sure to keep the protective
covering on.

Replacing a power supply

You can replace a power supply while the PowerConnect B-Series TI24X is powered on and running
(if two power supplies are installed). The power supplies are located in slots at the rear of the
PowerConnect B-Series TI24X .
Dell PowerConnect B-Series TI24X Hardware Installation Guide
53-1002265-01
Install a new fiber optic module in the port. For information about performing this task, refer to
"Installing a new fiber optic
(such as an equipment rack) to act as ground.
is keyed to prevent incorrect insertion.
future use.
the port connectors are cleaned thoroughly.
into the port connector or connectors until the tabs lock into place.
properly. For more information about the LED indicators, refer to
module".
Replacing a power supply
Table 5
on page 30.
5
39

Advertisement

Table of Contents
loading

Table of Contents