Exterior Masonry Chimneys; Ategoryi Furnaces Nly ) - Goodman MH8 Installation Instructions Manual

Table of Contents

Advertisement

E
XTERIOR MASONRY
draft blower to properly orient the assembly. NOTE: If
the pipe section is less than 18", then attach it directly
to the chimney top on 3 sides and feed it through the
round cutout from the inside of the wrapper.
11. Reattach the induced draft blower using the (4) screws
retained from step 3. Ensure the gasket located between
the induced draft blower and collector box is rotated
accordingly.
12. Reconnect the induced draft blower power leads. NOTE:
If the wires are not long enough, pull extra wire from the
wire bundle in the blower compartment.
13. Reconnect the remaining flue pipe, and the pressure
switch tubing. Ensure that all wires and the pressure
switch tubing is at least one inch from the flue pipe, or
any other hot surface.
14. Restore power to furnace.
NOTE: In a horizontal installation the air conditioning coil
must be adequately supported by proper brackets and
supports. Inadequate coil support can result in furnace cabinet
distortion and air leakage.
Counterflow units are shipped with the induced draft blower
discharging from the top of the furnace. ("Top" as viewed for a
counterflow installation.)
Vent the furnace in accordance with the National Fuel Gas
Code NFPA54/ANSI Z223.1-latest edition. In Canada, vent the
furnace in accordance with the national standard of Canada,
CAN/CSA B149.1 and CAN/CSA B149.2- latest editions and
amendments.
N
 
 
 
EVER
ALLOW
THE
PRODUCTS
 
 
 
MONOXIDE
TO
ENTER
THE
RETURN
.
SUPPLY
E
M
C
XTERIOR
ASONRY
HIMNEYS
An exterior masonry chimney is defined as a "Masonry" chim-
ney exposed to the outdoors on one or more sides below the
roof line." The ability to use a clay lined masonry chimney
depends on a parameter not associated with interior chimneys.
This variable is the geographic location of the installation. Re-
searchers have discovered that the winter design temperatures
have a direct impact on the suitability of this type of venting. In
most situations, the existing masonry chimneys will require a
properly sized metallic liner.
C
HIMNEYS
WARNING
 
 
 
OF
COMBUSTION
INCLUDING
CARBON
 
 
 
DUCTWORK
OR
CIRCULATION
(C
I F
A TEGORY
URNACES
- C
I F
ATEGORY
P
 
OSSIBILITY
 
DAMAGING
CONDENSATION
 
 
WHEN
A
SINGLE
FURNACE
IS
 
CONNECT
AN
 
 
FURNACE
IS
COMMON
 
APPLIANCE
OR
 
METAL
VENT
 
 
SIZED
IN
ACCORDANCE
80% 
FURNACE
APPLIANCE
THE
 
 
EXIST
WITH
EXTREMELY
 
EXTERIOR
CHIMNEYS
T
 
 
 
HE
RISK
OF
 
MASONRY
CHIMNEY
 T
 B 
OR
YPE
METAL
 
 
 
AIR
Clean Out
O
)
NL Y
C
HECKLIST
This checklist serves as a summary of the items to be checked
before venting an 80+ furnace into a masonry chimney. In addi-
tion, we recommend that a qualified serviceman use this check-
list to perform a yearly inspection of the furnace venting sys-
tem.
This checklist is only a summary. For detailed information on
each of the procedures mentioned, see the paragraph refer-
enced with each item.
This inspection is based upon a draft topical report, "Masonry
Chimney Inspection and Relining", issued by the Gas Research
Institute. While not yet finalized, we believe this report repre-
sents the best information on this subject which is currently
available.
12
O
URNACES
NLY
WARNING
 
 
OF
PROPERTY
DAMAGE
PERSONAL
 
 
 
CAN
OCCUR
INSIDE
 
 C
 I 
FAN
ASSISTED
ATEGORY
 
 
 
 
VENTED
WITHOUT
ADEQUATE
DILUTION
 80% 
 
 
 
FURNACE
TO
A
MASONRY
 
 
 
 
VENTED
WITH
A
DRAFT
 
 
 
 
 
 
THE
CHIMNEY
IS
LINED
WITH
. A
 
 
 
LL
INSTALLATIONS
USING
MASONRY
 
 
 
WITH
THE
APPROPRIATE
 
 
 
 
 
IS
COMMON
VENTED
WITH
A
 
 
 
POTENTIAL
FOR
CONDENSATION
 
 
COLD
CONDITIONS
 
 
OR
ANY
COMBINATION
 
 
 
CONDENSATION
DAMAGE
IS
BEST
 
 
 
 
 
AS
A
PATHWAY
FOR
PROPERLY
 
.
VENT
Wash
Clay Tile Size: 8" x 8" x12"
(Each x 24" Length)
1/2" to 1" Air Space
Throat
Damper
Breech
F.A.F. Vent
Connector
Fan Assisted
Forced Air
Furnace
Typical Multiple Flue Clay Tile Chimney
S
UMMARY
 
 
 
 
INJURY
OR
DEATH
 
 
 
MASONRY
CHIMNEYS
 (80% AFUE 
APPLIANCE
 
. D
 
 
AIR
O
NOT
 
 
 
 
CHIMNEY
UNLESS
THE
 
 
 
HOOD
EQUIPPED
 
 
 
 T
 B 
A
METAL
LINER
OR
YPE
 
 
 
 
CHIMNEYS
MUST
BE
 
 
. I
 
 
VENTING
TABLES
F
AN
 
 
 
 
DRAFT
HOOD
EQUIPPED
 
 
 
 
DAMAGE
MAY
STILL
 
 
LONG
VENT
CONNECTORS
 
 
 
OF
THESE
CONDITIONS
 
 
 
 
AVOIDED
BY
USING
 
 
 
 
SIZED
METAL
LINER
Roof Line
Attic Floor
Second Floor
First Floor
Water Heater
Vent Connector
Natural Draft
Water Heater
Basement Floor

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents