Caution: Shell Extension Instructions - Mr. Heater MH200CV Operation And Owner's Manual

Convection construction heater
Table of Contents

Advertisement

CAUTION: NEVER IgNITE ANd / OR RUN THIS HEATER UNlESS THE SHEllS
ARE FUllY EXTENdEd ANd lOCKEd INTO pOSITION.
STEP 1: HEATER AS REcEIVED oUT oF BoX. BEFoRE
LIFTInG oUTER SHELL PRoTEcT HAnDS. nEVER
GRASP BARE METAL WITHoUT HAnD PRoTEcTIon.
Make sure clip goes into
slot in lower shell.
3 Places
STEP 3: LIFT oUTER SHELL UnTIL ALL THREE cLIPS
EnGAGE SLoTS In LoWER SHELL. WHEn THIS HAPPEnS,
THE ScREW HoLES WILL LInE UP.
CAUTION: NEVER IgNITE ANd / OR RUN THIS HEATER UNlESS THE SHEllS
ARE FUllY EXTENdEd ANd lOCKEd INTO pOSITION.
Enerco Group, Inc. | convection construction Heater
STEp 2: LIfT OuTEr SHELL STrAIGHT up. CArE MuST bE TAKEN
To PRoTEcT HAnDS DURInG LIFT.
Lock shells together and
clips in place with screws
in each clip. 3 Screws
Total.
STEP 4: LocK THE cLIP InTo PLAcE WITH 3 ScREWS AS
SHoWn. THE HEATER MUST noT BE oPERATED UnLESS THE
oUTER SHELL IS PRoPERLY EXTEnDED AnD FULLY LocKED InTo
PLAcE.
5
operating Instructions and owner's Manual
70486 Rev. D 04/08

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mh80cvMh80cvHeatstar hs80cvHeatstar hs200cv

Table of Contents