Event Scheduling - Hitachi CP-A221N User Manual

Hide thumbs Also See for CP-A221N:
Table of Contents

Advertisement

7. Other Functions

7.3 Event Scheduling

The scheduling function enables to setup scheduled events including power on /
power off. It enables to be "self-management" projector.
NOTE
• You can schedule the following control events: Power, Input Source,
My Image, Messenger, Slideshow. (
• The power on / off event has the lowest priority among the all events that are
defined at the same time.
• There are 3 types of Scheduling, 1) daily 2) weekly 3) specific date. (
• The priority for scheduled events is as follows 1) specific date 2) weekly 3)
daily.
• Up to five specific dates are available for scheduled events. Priority is given to
those with the lower numbers when more than one event has been scheduled
for the same date and time (e.g., 'Specific date No. 1' has priority over 'Specific
date No. 2' and so on.
• Be sure to set the date and time before enabling scheduled events. (
82
57)
56)
59)

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Cp-a301nCp-aw251nCp-a221nmCp-a301nmCp-aw251nm

Table of Contents