General Site Preparation Guidelines
Delivery Survey
Figure 2-2
Delivery Survey (Part 1)
Is dock large enough for a semitrailer?
Circle the location of the dock and give street name if different than address.
Circle the location of access door and list street name if different than address.
List height ___________ and width ___________ of access door.
List special permits (if required) for street delivery.
Permit type:
______________________________________
______________________________________
42
DELIVERY CHECKLIST
DOCK DELIVERY
North
West
South
STREET DELIVERY
North
West
South
Yes ___________ No ___________
East
East
Agency obtained from:
______________________________________
______________________________________
Chapter 2