Table 2-5
Site Inspection Checklist (Continued)
Please check either Yes or No. If No, include comment# or date
8.
Is there a remote console telephone line available with an
RJ11 jack?
9.
Is a telephone line available?
10.
Are customer supplied peripheral cables and LAN cables
available and of the proper type?
11.
Are floor tiles in good condition and properly braced?
12.
Is floor tile underside shiny or painted? If painted, judge
the need for particulate test
No.
Area or condition
13.
Are lighting levels adequate for maintenance?
14.
Are there AC outlets available for servicing needs? (for
example, vacuuming)
15.
Does the input voltage correspond to equipment
specifications?
15A
Is dual source power used? If so, identify type(s) and
evaluate grounding.
16.
Does the input frequency correspond to equipment
specifications?
17.
Are lightning arrestors installed inside the building?
18.
Is power conditioning equipment installed?
19.
Is there a dedicated branch circuit for equipment?
20.
Is the dedicated branch circuit less than 250 feet (72.5
meters)?
21.
Are the input circuit breakers adequate for equipment
loads?
No.
Area or condition
22.
Is there an emergency power shut-off switch?
23.
Is there a telephone available for emergency purposes?
24.
Is there a fire protection system in the computer room?
25.
Is antistatic flooring installed?
Chapter 2
Power and Lighting
Safety
General Site Preparation Guidelines
Sample Site Inspection Checklist
Comment or Date
Yes
No
Yes
No