Nylon Head Installation; Front Handle Installation - Echo SRM - 2100SB Operator's Manual

Grass trimmer/brush cutter
Hide thumbs Also See for SRM - 2100SB:
Table of Contents

Advertisement

16
NYLON LINE HEAD INSTALLATION
Tools Required: Head Locking Tool
Parts Required: Nylon Line Head.
1. Align locking hole in upper plate (B) with notch in edge of gear
housing and insert head locking tool (A).
2. Remove plastic sleeve from P.T.O. shaft (C).
3. Be sure upper plate (B) remains on P.T.O. shaft.
4. Thread line head onto P.T.O. shaft by turning it counter clockwise
until head is tight against upper plate (B).
5. Remove locking tool (B).

FRONT HANDLE INSTALLATION

Tools Required: Screwdriver.
Parts Required: Front Handle Assembly
1. Assemble front handle on drive shaft, DO NOT tighten screws yet.
2. Position front handle for comfortable operation and secure screws.
A
C
B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srm-2100sb type 1eSrm - 2400sb

Table of Contents