Download Print this page

EarthStone woofire oven Installation Instructions Manual page 13

Wood-fire oven

Advertisement

EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED
RESIDENTIAL DIRECT VENTING
FOR ORDERING PARTS MENTIONED ON THIS PAGE CONTACT EARTHSTONE 800-840-4915 OR YOUR
SUPPLIER.
MODELS 60 & 90 & 110 USE 6 INCH INSIDE DIAMETER GREASE DUCT/BUILDING HEATING
APPLIANCE CHIMNEY
CHIMNEY ROUND TOP (P-CT)
GREASE DUCT HEATING APPLIANCE CHIMNEY ATTACHED TO PRIMARY HOOD
THIS DIAGRAM GENERALLY DEPICTS THE INSTALLATION REQUIRED TO MAINTAIN THE U.L. LISTING OF THE OVEN
FOR THIS TYPE OF VENTING APPLICATION.
FOR SPECIFIC INSTALLATION REQUIREMENTS REFER TO SELKIRK METALBESTOS MODEL IPS GREASE DUCT
INSTALLATION 8. MODEL PS AND IPS GREASE DUCT COMPLIES WITH NFPA, SBCCI, ICBO AND BOCA WHEN
PROPERLY INSTALLED PER ITS INSTALLATION INSTRUCTIONS.
CONTACT LOCAL AUTHORITY HAVING JURISDICTION REGARDING FIRE RATED DUCT SHAFT.
NOTE: OTHER U.L. LISTED SYSTEMS MAY BE SUBSTITUTED FOR THE METALBESTOS SYSTEM DEPICTED
IN THIS DIAGRAM. TO MAINTAIN THE U.L. LISTING OF THE OVEN THE SYSTEM MUST BE A U.L. LISTED
GREASE DUCT WHICH IS ALSO A U.L. LISTED BUILDING HEATING APPLIANCE CHIMNEY INSTALLED IN
ACCORDANCE WITH THE MANUFACTURER'S GREASE DUCT INSTALLATION INSTRUCTIONS.
STORM COLLAR (SC-C1)
FLASHING
FIGURE 18
ROOF BRACE KIT (RBK) IF REQUIRED
10

Advertisement

loading