Installation Instructions; Rack Requirements; Rack Installation - Dell PowerEdge 2410 Installation Manual

Document
Hide thumbs Also See for PowerEdge 2410:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
CAUTION:
Do not move racks by yourself. Due to the height and weight of the
rack, a minimum of two people should accomplish this task.
Before working on the rack, make sure that the stabilizers are secured to
the rack, extended to the floor, and that the full weight of the rack rests on
the floor. Install front and side stabilizers on a single rack or front
stabilizers for joined multiple racks before working on the rack.
Always load the rack from the bottom up, and load the heaviest item in the
rack first.
Make sure that the rack is level and stable before extending a component
from the rack.
Use caution when pressing the component rail release latches and sliding a
component into or out of a rack; the slide rails can pinch your fingers.
Ensure that proper airflow is provided to components in the rack.
Do not step on or stand on any component when servicing other
components in a rack.

Installation Instructions

This installation guide provides instructions for trained service technicians
installing a 42-unit (U) rack. Information includes assembling the rack,
coupling two 42-U racks, and routing cables through the rack. The 42-U rack
can be installed using the recommended tools.

Rack Requirements

NOTICE:
The 42-U rack meets the specifications of American National
Standards Institute (ANSI)/Electronic Industries Association (EIA) standard
ANSI/EIA-310-D-92, Consumer Electronics Association (CEA) Standard CEA-310-E,
International Electrotechnical Commission (IEC) 297, and Deutsche Industrie Norm
(DIN) 41494.

Rack Installation

Before attempting this installation, you should read through this entire
procedure carefully.
6
Dell™ PowerEdge™ 4210 Installation Guide

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents