Summary of Contents for Field Controls 46144900 CK-61
Page 1
120 VAC SYSTEM CONTROL KIT Model: CK-61 Designed for use on SWG Series Power Vent Hoods for controlling oil fired heating appliances with 120 VAC controls. TEMS INCLUDED IN KIT 1) Junction box with mounted pressure switch and solid state post purge control 1) 2 Ft.
INSTALLATION OUNTING UNCTION The junction box can be mounted at the venter or remotely mounted away from the venter. (See Figure 1 & Figure 2) 1. Remove one of the knockouts from the side of the junction box where the pressure switch is mounted. Install the flexible conduit connector onto the CK-61 Junction Box and secure with fastening nut.
WIRING INSTRUCTIONS Wire the venter motor and controls in accordance with the National Electrical Code, manufacturer's recommendations and/or applicable local codes. UNIT MUST GROUNDED. Check ground circuit to make certain that the unit has been properly grounded. The wiring should be protected by an over current circuit device rated at 15 amperes.
ADJUSTMENTS RESSURE WITCH DJUSTMENTS With the venter air flow set and the appliance operating at the best operating efficiency, adjust the pressure switch by rotating the adjustment screw clockwise until the burner shuts off, then rotate the adjustment screw counterclockwise until the burner fires. Rotate the adjustment screw an additional 1/4 turn counterclockwise to ensure proper switch setting.
Page 7
INSTALLATION INFORMATION MODEL NO.: _____________________________________________________ CK-61 INSTALLER'S NAME: ______________________________________________ INSTALLER'S COMPANY: __________________________________________ INSTALLER'S PHONE NO.: _________________________________________ DATE OF INSTALLATION: __________________________________________ Page 7...