Table Of Contents - Cisco NPE-G2 - Network Processing Engine G2 Installation And Configuration Information

Installation guide
Hide thumbs Also See for NPE-G2 - Network Processing Engine G2:
Table of Contents

Advertisement

Installing the NPE-G1 or NPE-G2
To install the NPE-G1 or NPE-G2 in the router, use the following procedures:
Basic Guidelines
If you have difficulty installing a network processing engine or I/O controller in the lowest slot of a Cisco
Note
7200 VXR router that is rack-mounted, remove the port adapters, network processing engine and I/O
controller from the chassis and reinstall them. Install the network processing engine and I/O controller
in the lowest slots first, then populate the slots above them, in a bottom-to-top order.
Use the following guidelines when installing the NPE-G1 or NPE-G2:
Ensure that the router is powered down and the input power cable is disconnected from the router and
the power source. See the
page
Step 2
Attach an ESD-preventive wrist strap between you and an unfinished chassis surface.
Step 3
Remove the NPE-G1 or NPE-G2 from its static shielding bag.
Step 4
When touching the NPE-G1 or NPE-G2, use both hands, grasp the NPE-G1 or NPE-G2 by its metal
carrier edges, and orient it so that its printed circuit board components face upward.
Handle the NPE-G1 or NPE-G2 by the carrier edges and handle only; never touch the printed circuit
Caution
board components or connector pins.
Network Processing Engine and Network Services Engine Installation and Configuration
7-18
Basic Guidelines, page 7-18
Installing a CompactFlash Disk, page 7-19
Installing a USB Flash Memory Module or eToken-NPE-G2, page 7-19
Reconnecting Input Power and Powering Up the Router, page 7-35
"Powering Down the Router and Disconnecting Input Power" section on
7-8.
Chapter 7
NPE-G1 and NPE-G2 Installation and Configuration Information
OL-4448-12

Advertisement

Table of Contents
loading

This manual is also suitable for:

G1 - network processing engine g1Npe-g1

Table of Contents